Leaking Backflow Replacement in Fallbrook, CA
Details
Client Pala Mesa Village
Completed 9/10/2020
Timeframe 1 Day
Location Fallbrook
ASAP was called out for a leaking valve at the exterior of an apartment complex. The leak was so heavy, the water was shut off to the property by the City of Fallbrook. Upon arrival, ASAP investigated and found the valve for the backflow preventer was not sold separately by the manufacturer. ASAP proposed to replace the backflow preventer. Unfortunately, due to the city shutting off the water ASAP was unable to restore water to the building.